How To Fix TAN_TCC1051 - Derivative contract specification status must not be 'In Preparation'


TAN_TCC1051 - Overview

  • Message type: E = Error

  • Message class: TAN_TCC1 - Commodity Curve Message Class

  • Message number: 051

  • Message text: Derivative contract specification status must not be 'In Preparation'

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message TAN_TCC1051 - Derivative contract specification status must not be 'In Preparation' ?
    The SAP error message TAN_TCC1051 indicates that there is an issue with the status of a derivative contract specification in the system. Specifically, the error states that the status of the derivative contract specification must not be 'In Preparation' when you are trying to perform a certain action, such as posting or processing the contract.
    
    Cause: The error typically arises when: You are attempting to execute a transaction or process that requires the derivative contract specification to be in a finalized state, but it is still in the 'In Preparation' status. The contract has not been fully defined or completed, meaning that required fields or configurations are missing. There may be a workflow or approval process that has not been completed, preventing the contract from moving to a finalized status.
    Solution: To resolve the TAN_TCC1051 error, you can take the following steps: Check Contract Status: Verify the status of the derivative contract specification. If it is indeed 'In

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant