How To Fix T4311 - Key Date &1 for &4 should be between Start Date &2 and End Date &3


T4311 - Overview

  • Message type: E = Error

  • Message class: T4 - Time deposit processing

  • Message number: 311

  • Message text: Key Date &1 for &4 should be between Start Date &2 and End Date &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message T4311 - Key Date &1 for &4 should be between Start Date &2 and End Date &3 ?
    The SAP error message T4311 indicates that a key date specified in a transaction or process is not within the valid range defined by a start date and an end date. This error typically occurs in scenarios involving planning, scheduling, or any time-sensitive data entry where date constraints are enforced.
    
    Cause: The error message T4311 is triggered when: The key date (denoted as &1) you are trying to use falls outside the range defined by the start date (&2) and end date (&3). This can happen in various contexts, such as when creating or modifying a planning scenario, scheduling a production order, or entering data in a planning table.
    Solution: To resolve this error, you can take the following steps: Check the Key Date: Verify the key date you are trying to use. Ensure that it is intended and correctly entered. Review Start and End Dates: Look at the start date (&2) and end date (&3) that are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant