Message type: E = Error
Message class: T0 - General Treasury
Message number: 830
Message text: Planned record cannot be created (see long text)
If a correspondence planned record is created, a valid entry must exist
for the correspondence in Customizing. This Customizing entry defines a
SAPscript form used to create correspondence, for example.
You do not need to specify a form name for the 'SWIFT file' and 'IDoc'
correspondence media.
&WHAT_TO_DO& / &SYS_ADMIN&
Check to see if a change to correspondence Customizing is worthwhile.
After a possible change, you could create a planned record.
Error message extract from SAP system. Copyright SAP SE.
T0830
- Planned record cannot be created (see long text) ?The SAP error message T0830, which states "Planned record cannot be created (see long text)," typically occurs in the context of planning and scheduling within SAP, particularly in modules like Production Planning (PP) or Materials Management (MM). This error indicates that there is an issue preventing the creation of a planned record, which could be a planned order, a production order, or a similar entity.
Possible Causes:
- Missing Master Data: The required master data (like material master, BOM, routing, etc.) may not be set up correctly or may be missing.
- Incorrect Configuration: The configuration settings for the planning process may not be set up correctly, leading to issues in creating planned records.
- Capacity Constraints: There may be capacity constraints in the work centers that prevent the creation of new planned orders.
- Planning Parameters: Incorrect planning parameters or settings in the planning run could lead to this error.
- Status Issues: The status of the material or the order type may not allow for the creation of planned records.
- Date Issues: The dates specified for the planned order may be outside of the permissible range.
Solutions:
- Check Master Data: Ensure that all necessary master data is correctly maintained. This includes checking the material master, BOM, and routing.
- Review Configuration: Verify the configuration settings in the planning area to ensure they are set up correctly for the type of planning you are performing.
- Analyze Capacity: Check the capacity of work centers to ensure that there are no constraints that would prevent the creation of planned orders.
- Adjust Planning Parameters: Review and adjust the planning parameters used in the planning run to ensure they are appropriate for the current scenario.
- Check Status: Ensure that the material and order types are in a status that allows for the creation of planned records.
- Validate Dates: Make sure that the dates for the planned order are within the acceptable range and that there are no conflicts.
Related Information:
If you continue to experience issues after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP documentation for more detailed troubleshooting steps.
Get instant SAP help. Sign up for our Free Essentials Plan.
T0829
The counterconfirmation has not yet been matched
What causes this issue? The preceding business transaction has not yet been counterconfirmed. First match the counterconfirmation. &FURTHER_HINTS...
T0828
Confirmation (Correspondence type &1; medium &2) not yet carried out
What causes this issue? The confirmation (= status-relevant correspondence planned record) has not yet been carried out for the previous activity. Ge...
T0831
Planned record not created as it already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
T0832
& is an internal correspondence type. Therefore, only 'Print' is possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.