Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix STEP931 - Create PNAL: Nodes not defined


SAP Error Message - Details

  • Message type: E = Error

  • Message class: STEP - ISO 10303 STEP Mapping Messages

  • Message number: 931

  • Message text: Create PNAL: Nodes not defined

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message STEP931 - Create PNAL: Nodes not defined ?

    The SAP error message "STEP931 Create PNAL: Nodes not defined" typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with the creation of a Production Network Allocation (PNAL) or similar planning processes. This error indicates that the system is unable to find the necessary nodes (such as locations, resources, or other entities) that are required for the planning process.

    Cause:

    1. Missing Master Data: The most common cause of this error is that the required master data (like locations, resources, or other nodes) has not been defined or is incomplete in the system.
    2. Configuration Issues: There may be configuration issues in the planning area or the planning book that prevent the system from recognizing the nodes.
    3. Data Consistency: There could be inconsistencies in the data, such as missing links between nodes or incorrect settings in the planning hierarchy.
    4. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the required nodes.

    Solution:

    1. Check Master Data: Ensure that all necessary master data is defined in the system. This includes checking for:

      • Locations (plants, storage locations)
      • Resources (machines, labor)
      • Other relevant nodes that are part of the planning process.
    2. Review Configuration: Verify the configuration settings in the APO system:

      • Check the planning area settings to ensure that all nodes are correctly defined.
      • Review the planning book settings to ensure that the correct nodes are included.
    3. Data Consistency Check: Perform a consistency check on the master data to identify any missing or incorrect entries. This can often be done using transaction codes like /SAPAPO/MDP or similar tools in APO.

    4. Authorization Check: Ensure that the user has the necessary authorizations to access the required nodes. This can be checked with the help of your SAP security team.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific version of your SAP system for any known issues or additional troubleshooting steps.

    6. Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, providing them with the error details and any relevant logs.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/MDP for master data maintenance and /SAPAPO/SDP94 for planning book configuration.
    • SAP Notes: Search for SAP Notes related to this error message in the SAP Support Portal, as there may be specific patches or updates that address this issue.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify and resolve the "STEP931 Create PNAL: Nodes not defined" error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant