Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix START_MESSAGES074 - Test Plan & is already scheduled with same variant,at same date and time


START_MESSAGES074 - Overview

  • Message type: E = Error

  • Message class: START_MESSAGES -

  • Message number: 074

  • Message text: Test Plan & is already scheduled with same variant,at same date and time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


START_MESSAGES074 - Details

  • The SAP error message "START_MESSAGES074 Test Plan & is already scheduled with same variant, at same date and time" indicates that there is an attempt to schedule a test plan that has already been scheduled with the same variant at the specified date and time. This typically occurs in the context of SAP Quality Management (QM) or Test Management scenarios.
    
    Cause: Duplicate Scheduling: The test plan you are trying to schedule is already scheduled for execution with the same parameters (variant, date, and time). Concurrency Issues: There may be multiple users trying to schedule the same test plan simultaneously, leading to conflicts. System Configuration: The system may have restrictions or settings that prevent the same test plan from being scheduled multiple times at the same time.
    Solution: Check Existing Schedules: Go to the scheduling or planning transaction (e.g., transaction code QST0 for test plans) and check if the test plan is already scheduled for the same

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


START_MESSAGES074 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant