How To Fix /SMB/UTILITY116 - /SMB/STATUS: PRJID &1 is not assigned to BBK &2 (Multiple Activation!)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SMB/UTILITY -

  • Message number: 116

  • Message text: /SMB/STATUS: PRJID &1 is not assigned to BBK &2 (Multiple Activation!)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/UTILITY116 - /SMB/STATUS: PRJID &1 is not assigned to BBK &2 (Multiple Activation!) ?
    The SAP error message /SMB/UTILITY116 /SMB/STATUS: PRJID &1 is not assigned to BBK &2 (Multiple Activation!) typically occurs in the context of SAP Business ByDesign or SAP S/4HANA when there is an issue with project IDs (PRJID) and their assignment to a specific BBK (Business Blueprint Key). This error indicates that the system is trying to activate a project that is not correctly linked to the specified BBK, and it may also suggest that there are multiple activations happening simultaneously, which can lead to conflicts.
    
    Cause: Project ID Not Assigned: The project ID you are trying to activate is not assigned to the specified BBK. Multiple Activations: There may be multiple activations of projects happening at the same time, which can lead to conflicts in the system.
    Configuration Issues: There may be configuration issues in the system that prevent the proper assignment of project IDs to BBKs. Data Integrity Issues: There could be data integrity

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author