How To Fix /SMB/UTILITY090 - Building Block &1 shows activated for PRJID &2 but not all tasks.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SMB/UTILITY -

  • Message number: 090

  • Message text: Building Block &1 shows activated for PRJID &2 but not all tasks.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/UTILITY090 - Building Block &1 shows activated for PRJID &2 but not all tasks. ?
    The SAP error message /SMB/UTILITY090 indicates that there is an issue with a Building Block (BB) in the context of a project (PRJID). Specifically, it suggests that the Building Block is activated for the project, but not all tasks associated with it are activated. This can lead to inconsistencies or incomplete configurations in the project.
    
    Cause: Incomplete Activation: Some tasks related to the Building Block may not have been activated, which can happen if the activation process was interrupted or if there were errors during the activation.
    Configuration Issues: There may be configuration issues in the project or the Building Block that prevent all tasks from being activated. Dependencies: Certain tasks may have dependencies on other tasks or configurations that are not yet activated or completed. Version Mismatch: There could be a mismatch between the versions of the Building Block and the project, leading to activation issues.
    Solution: Check Activation Status: Review the activation status of all

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author