How To Fix /SMB/TRANSP_INFRA662 - Business Change Project


/SMB/TRANSP_INFRA662 - Overview

  • Message type: E = Error

  • Message class: /SMB/TRANSP_INFRA -

  • Message number: 662

  • Message text: Business Change Project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/TRANSP_INFRA662 - Business Change Project ?
    The SAP error message /SMB/TRANSP_INFRA662 typically relates to issues encountered during the execution of a Business Change Project (BCP) in the SAP system. This error can arise due to various reasons, including configuration issues, missing authorizations, or problems with the transport infrastructure.
    
    Cause:
    Configuration Issues: The system may not be properly configured for the Business Change Project, leading to inconsistencies. Missing Authorizations: The user executing the project may lack the necessary authorizations to perform the required actions. Transport Layer Problems: Issues with the transport layer, such as missing transport requests or problems with the transport directory, can trigger this error. System Version Compatibility: The project may not be compatible with the current version of the SAP system.
    Solution: Check Configuration: Review the configuration settings for the Business Change Project to ensure everything is set up correctly. Verify Authorizations: Ensure that the user has the necessary authorizations to execute the project. This may involve checking roles and permissions in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker