Do you have any question about this error?
Message type: E = Error
Message class: /SMB/TRANSP_INFRA -
Message number: 040
Message text: Parallel run completed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SMB/TRANSP_INFRA040
- Parallel run completed ?The SAP error message
/SMB/TRANSP_INFRA040 Parallel run completed
typically indicates that a parallel transport run has been completed in the SAP system. This message is not necessarily an error but rather an informational message indicating the status of a transport operation.Cause:
- Transport Management System (TMS): This message is generated as part of the Transport Management System when multiple transport requests are processed in parallel.
- Transport Requests: It may occur when you are executing multiple transport requests simultaneously, and the system is notifying you that the parallel processing has finished.
Solution:
- Check Transport Logs: Review the transport logs to ensure that all transport requests have been processed successfully. You can do this by navigating to the Transport Organizer (transaction code SE09 or SE10) and checking the status of the transport requests.
- Monitor System Performance: If you are running multiple transports in parallel, monitor the system performance to ensure that it is not being overloaded, which could lead to issues with transport processing.
- Review Dependencies: Ensure that there are no dependencies between the transport requests that could cause issues if they are executed in parallel.
- Retry if Necessary: If you encounter issues with specific transport requests, you may need to retry those requests individually rather than in parallel.
Related Information:
If you are experiencing issues beyond the informational message, it may be helpful to consult with your SAP Basis team or refer to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SMB/TRANSP_INFRA039
Package started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/TRANSP_INFRA038
Job started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/TRANSP_INFRA041
Job completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/TRANSP_INFRA042
Package completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.