How To Fix /SMB/Q2P_DEPLOY139 - Check is in progress. Please wait until it is completed.


/SMB/Q2P_DEPLOY139 - Overview

  • Message type: E = Error

  • Message class: /SMB/Q2P_DEPLOY -

  • Message number: 139

  • Message text: Check is in progress. Please wait until it is completed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/Q2P_DEPLOY139 - Check is in progress. Please wait until it is completed. ?
    The SAP error message /SMB/Q2P_DEPLOY139 Check is in progress. Please wait until it is completed. typically indicates that a deployment or check process is currently running in the background, and the system is not able to proceed with further actions until this process is completed. This message is often seen in the context of SAP Business Technology Platform (BTP) or SAP Cloud solutions, particularly when deploying applications or updates.
    
    Cause: Ongoing Process: The most common cause of this error is that a previous deployment or check process is still running. This could be due to a long-running operation or a process that has not yet completed. System Lock: The system may be locked due to a previous operation that did not finish properly, causing subsequent operations to be blocked. Resource Constraints: If the system is under heavy load or if there are resource constraints, it may take longer for the check or deployment to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant