How To Fix /SMB/Q2P223 - Project name is changed


/SMB/Q2P223 - Overview

  • Message type: E = Error

  • Message class: /SMB/Q2P -

  • Message number: 223

  • Message text: Project name is changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/Q2P223 - Project name is changed ?
    The SAP error message /SMB/Q2P223 Project name is changed typically indicates that there has been a modification to the project name in the system, which may affect various processes or data associated with that project. This error can arise in different contexts, such as during project management activities, reporting, or data entry.
    
    Cause: Project Name Change: The most direct cause of this error is that the project name has been altered in the system after it was initially created or referenced in other transactions. Data Consistency Issues: If there are inconsistencies in the database due to the project name change, it may lead to this error when trying to access or manipulate project-related data. User Permissions: Sometimes, the user may not have the necessary permissions to view or edit the project after its name has been changed.
    Solution: Verify Project Name: Check the current project name in the system to ensure that you are using the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker