How To Fix /SMB/Q2P085 - Q system in initial state - Lifecycle is running in project client only


/SMB/Q2P085 - Overview

  • Message type: E = Error

  • Message class: /SMB/Q2P -

  • Message number: 085

  • Message text: Q system in initial state - Lifecycle is running in project client only

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SMB/Q2P085 - Details

  • The SAP error message /SMB/Q2P085 indicates that the Q (Quality Assurance) system is in an initial state and that the lifecycle is running only in the project client. This typically occurs in the context of SAP Solution Manager or during the implementation of SAP projects where the system is not fully configured or is in a specific state of readiness.
    
    Cause: Initial State: The Q system may not have been fully set up or configured. This can happen if the system is newly created or if it has not been properly transported with the necessary configurations. Project Client: The lifecycle management is only active in the project client, which means that the Q system is not yet fully integrated into the overall landscape or is not yet ready for testing or production use. Missing Configuration: There may be missing configurations or settings that need to be applied to transition the system from the initial

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SMB/Q2P085 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker