Message type: E = Error
Message class: /SMB/Q2P -
Message number: 081
Message text: Lifecycle Project status must be changed with matching BCP
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SMB/Q2P081
- Lifecycle Project status must be changed with matching BCP ?The SAP error message /SMB/Q2P081 indicates that there is an issue with the lifecycle project status in relation to the Business Configuration Project (BCP). This error typically arises when there is a mismatch between the status of the lifecycle project and the corresponding BCP.
Cause: Status Mismatch: The lifecycle project status does not match the expected status in the BCP. For example, if the BCP is in a certain status (like "In Progress"), the lifecycle project may need to be in a compatible status (like "Active").
Configuration Issues: There may be configuration settings that are not aligned between the lifecycle project and the BCP. Incomplete Setup: The lifecycle project may not have been fully set up or may be missing necessary components that link it to the BCP.
Solution: Check Project Status: Verify the status of both the lifecycle project and the BCP. Ensure that they are aligned and that the lifecycle project is in a
Get instant SAP help. Sign up for our Free Essentials Plan.
/SMB/Q2P080
More than one Business Change Project not in status 'In Progress'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/Q2P079
Client copy pending in client &1; no lifecycle activity allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/Q2P082
Use in productive system not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/Q2P083
No usable transport request exists; activation not allowed
What causes this issue? No usable transport request exists. Activation cannot be started.System Response You are not allowed to activate the solutio...
Click on this link to search all SAP messages.