How To Fix /SMB/Q2P055 - Q to P project is locked by user &1


/SMB/Q2P055 - Overview

  • Message type: E = Error

  • Message class: /SMB/Q2P -

  • Message number: 055

  • Message text: Q to P project is locked by user &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/Q2P055 - Q to P project is locked by user &1 ?
    The SAP error message /SMB/Q2P055 indicates that a project in the SAP system is locked by a specific user. This typically occurs in the context of project management within SAP, particularly when using the SAP Project System (PS) module or similar functionalities.
    
    Cause: User Lock: The project is currently being accessed or modified by another user, which prevents other users from making changes to it. Session Timeout: A user may have left a session open, causing the project to remain locked. System Error: Sometimes, a system error or crash can leave a project in a locked state. Inadequate Permissions: The user may not have the necessary permissions to unlock or access the project.
    Solution: Identify the Locking User: Check the user ID mentioned in the error message (&1). This user is currently locking the project. Contact the Locking User: If possible, reach out to the user who has locked the project and ask them to release the lock

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant