How To Fix /SMB/FUNCTION_SWITCH018 - Switch from old Q2P to new Q2P needs to be set to in preparation first


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SMB/FUNCTION_SWITCH -

  • Message number: 018

  • Message text: Switch from old Q2P to new Q2P needs to be set to in preparation first

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/FUNCTION_SWITCH018 - Switch from old Q2P to new Q2P needs to be set to in preparation first ?
    The SAP error message /SMB/FUNCTION_SWITCH018 indicates that there is an issue with the configuration of the switch from the old Q2P (Quote to Pay) process to the new Q2P process. This error typically arises when the system is not properly set up to transition between these two processes.
    
    Cause: The error occurs because the system requires that the switch from the old Q2P process to the new Q2P process be set to "in preparation" before any further actions can be taken. This is a part of the configuration settings that need to be adjusted to ensure that the system can handle the new process correctly.
    Solution: To resolve this error, you need to follow these steps: Access the Configuration Settings: Go to the SAP Easy Access screen and navigate to the relevant configuration area for the Q2P process. This is usually found under the SPRO transaction code (SAP Project Reference Object). Locate the Function Switch: In the configuration

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker