Do you have any question about this error?
Message type: E = Error
Message class: /SMB/BB_BUILDER -
Message number: 206
Message text: Scope Item &1 unassigned from Solution &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SMB/BB_BUILDER206
- Scope Item &1 unassigned from Solution &2 ?The SAP error message
/SMB/BB_BUILDER206 Scope Item &1 unassigned from Solution &2
typically occurs in the context of SAP Business ByDesign or SAP S/4HANA Cloud implementations. This error indicates that a specific scope item (represented by&1
) is not assigned to the solution (represented by&2
) you are working with.Cause:
- Scope Item Not Assigned: The scope item you are trying to use or activate is not assigned to the current solution or project.
- Configuration Issues: There may be a misconfiguration in the project settings or scope management.
- Project Status: The project may not be in the correct status to allow for the assignment of scope items.
Solution:
Check Scope Item Assignment:
- Go to the project management area in your SAP system.
- Navigate to the scope management section.
- Verify if the scope item
&1
is assigned to the solution&2
. If it is not, you will need to assign it.Assign Scope Item:
- If the scope item is not assigned, you can add it by selecting the appropriate scope item from the available list and assigning it to your solution.
- Ensure that you save your changes.
Review Project Configuration:
- Check the overall configuration of your project to ensure that all necessary settings are correctly configured.
- Make sure that the project is in the correct status (e.g., not in a locked state).
Consult Documentation:
- Refer to the SAP documentation or implementation guide for specific instructions on managing scope items and solutions.
Contact SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support for assistance. They can provide guidance based on your specific system configuration and requirements.
Related Information:
By following these steps, you should be able to resolve the error message and successfully assign the required scope item to your solution.
Get instant SAP help. Start your 7-day free trial now.
/SMB/BB_BUILDER205
Scope Item &1 of Customer Solution &2 is not in Scope
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/BB_BUILDER204
Scope Item &1 is not included in Customer Solution &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/BB_BUILDER207
Scope Item &1 assigned to Solution &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/BB_BUILDER208
Scope Item &1 is activated and cannot be unassigned from Solution &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.