Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix SGT_01703 - Conflicting entries in Planned Ind. Requirements Consumption Node


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SGT_01 - SGT_01

  • Message number: 703

  • Message text: Conflicting entries in Planned Ind. Requirements Consumption Node

  • Show details Hide details
  • What causes this issue?

    You have maintained rules that conflict with each other for your
    <DS:GLOS.52B8D39C99790881E10000000A421392>segmentation strategy </>.
    Here's an example of a conflict:
    If you have maintained the following segmentation combinations for your
    strategy:
    <ZK>Q1IN</>
    <ZK>Q2IN</>
    <ZK>Q1DE</>
    <ZK>Q2DE</>
    And you have maintained rules as:
    <DS:GLOS.52C84557BBB45577E10000000A421947>Requirement Segment</>,,
    ,, <DS:GLOS.52CC92EFC3C95576E10000000A421947>Stock Segment</>
    ****,,****
    <ZK>**IN</>,,<ZK>**IN</>
    In this situation, the entries from rule 2 conflict with rule 1.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    You should maintain segmentation rules in a way in which the resulting
    combinations do not overlap with each other.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SGT_01703 - Conflicting entries in Planned Ind. Requirements Consumption Node ?

    The SAP error message SGT_01703 indicates that there are conflicting entries in the Planned Independent Requirements (PIR) consumption node. This typically occurs in the context of production planning and inventory management when there are inconsistencies in the planned independent requirements for a material.

    Cause:

    The error can arise due to several reasons, including:

    1. Overlapping Time Periods: There may be overlapping planned independent requirements for the same material in the same time period, which can lead to conflicts in consumption.

    2. Inconsistent Data: There might be inconsistencies in the data related to planned independent requirements, such as different consumption modes or settings that are not compatible.

    3. Incorrect Configuration: The configuration settings for the consumption of planned independent requirements may not be set up correctly, leading to conflicts.

    4. Manual Adjustments: Manual changes to planned independent requirements that do not align with the existing data can also cause this error.

    Solution:

    To resolve the SGT_01703 error, you can take the following steps:

    1. Check Planned Independent Requirements:

      • Go to the transaction code MD61 (Create Planned Independent Requirements) or MD62 (Change Planned Independent Requirements) to review the planned independent requirements for the affected material.
      • Look for overlapping entries or inconsistencies in the time periods.
    2. Adjust Time Periods:

      • If you find overlapping entries, adjust the time periods so that they do not conflict. Ensure that each entry has a unique time frame.
    3. Review Consumption Settings:

      • Check the consumption settings in the material master (transaction code MM02) under the MRP 2 view. Ensure that the settings are consistent and appropriate for your planning strategy.
    4. Delete or Modify Conflicting Entries:

      • If necessary, delete or modify the conflicting planned independent requirements to resolve the issue.
    5. Run MRP:

      • After making the necessary adjustments, run the Material Requirements Planning (MRP) process again to see if the error persists.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on managing planned independent requirements and resolving conflicts.

    Related Information:

    • Transaction Codes: MD61, MD62, MD03 (Display MRP), MD04 (Stock/Requirements List).
    • MRP Configuration: Review the configuration settings in SPRO related to MRP and planned independent requirements.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and inventory management.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant