Do you have any question about this error?
Message type: E = Error
Message class: SCTS_ABAP_VCS_MSG -
Message number: 010
Message text: Repository deletion error (Folder structure)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
SCTS_ABAP_VCS_MSG010
- Repository deletion error (Folder structure) ?The SAP error message SCTS_ABAP_VCS_MSG010 indicates a repository deletion error related to the folder structure in the context of version control systems (VCS) for ABAP development. This error typically arises when there are issues with the repository structure or when the system is unable to delete a specific folder or object due to various reasons.
Causes:
- Folder Structure Issues: The folder structure in the version control system may be corrupted or not aligned with the expected structure.
- Permissions: The user may not have the necessary permissions to delete the folder or object in the repository.
- Locked Objects: The objects or folders may be locked by another user or process, preventing deletion.
- Inconsistent State: The repository may be in an inconsistent state due to previous operations that did not complete successfully.
- Configuration Issues: There may be misconfigurations in the version control settings or the connection to the VCS.
Solutions:
- Check Permissions: Ensure that the user has the necessary permissions to delete the folder or object in the repository.
- Unlock Objects: If objects are locked, identify the user or process that has locked them and unlock them if appropriate.
- Verify Folder Structure: Check the folder structure in the version control system to ensure it is correct and consistent with the expected structure.
- Manual Deletion: If the system cannot delete the folder, consider manually deleting it from the version control system interface (if applicable).
- Reconfigure VCS Settings: Review and reconfigure the version control settings in SAP to ensure they are correct.
- Check Logs: Review the system logs for any additional error messages or information that may provide more context about the issue.
- Contact Support: If the issue persists, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the repository deletion error in SAP.
Get instant SAP help. Start your 7-day free trial now.
SCTS_ABAP_VCS_MSG009
Repository deletion error (Database)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SCTS_ABAP_VCS_MSG008
Repository creation error (Folder structure)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SCTS_ABAP_VCS_MSG011
System creation error (Folder structure)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SCTS_ABAP_VCS_MSG012
Client CMD creation error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.