How To Fix SCPR_ATC008 - Switch BC Set is not assigned to a switch (see package assignment)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SCPR_ATC - Message class for ATC checks on BC sets

  • Message number: 008

  • Message text: Switch BC Set is not assigned to a switch (see package assignment)

  • Show details Hide details
  • What causes this issue?

    Switch BC Set is no more assigned to a switch.

    System Response

    Switch BC set activation will fail.

    How to fix this error?

    Assign the switch BC set to a switch or delete the switch BC set in
    original system.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SCPR_ATC008 - Switch BC Set is not assigned to a switch (see package assignment) ?

    The SAP error message SCPR_ATC008, which states "Switch BC Set is not assigned to a switch (see package assignment)," typically occurs in the context of SAP's Switch Framework. This error indicates that a Business Configuration (BC) set is not properly assigned to a switch, which is necessary for the configuration to be activated or used in the system.

    Cause:

    1. Missing Assignment: The BC set you are trying to use is not assigned to any switch. This can happen if the BC set was created but not linked to the appropriate switch.
    2. Incorrect Package Assignment: The package that contains the BC set may not be correctly assigned to the switch.
    3. Transport Issues: If the BC set was transported from another system, there may have been issues during the transport that led to the assignment not being created.

    Solution:

    1. Check Switch Assignment:

      • Go to the Switch Framework in your SAP system (transaction code SCPR20).
      • Verify that the BC set is assigned to the correct switch. If it is not, you will need to assign it.
    2. Assign BC Set to Switch:

      • In the Switch Framework, navigate to the relevant switch.
      • Add the BC set to the switch by selecting the appropriate option to assign it.
    3. Check Package Assignment:

      • Ensure that the package containing the BC set is correctly assigned to the switch.
      • You can do this by checking the package settings in the Switch Framework.
    4. Transport Check:

      • If the BC set was transported, check the transport logs for any errors or warnings that might indicate why the assignment was not created.
      • If necessary, re-transport the BC set with the correct assignments.
    5. Consult Documentation:

      • Refer to SAP documentation or notes related to the Switch Framework and BC sets for any specific instructions or guidelines.

    Related Information:

    • Transaction Codes:

      • SCPR20: Switch Framework management.
      • SCPR20: To view and manage BC sets and their assignments.
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.

    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the SCPR_ATC008 error and ensure that your BC set is properly assigned to a switch.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author