Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: SCPR - BC Sets
Message number: 235
Message text: &1 ended with errors
An activation or activation simulation ended with errors.
The activation was probably not successful. The customizing data may
not have been written completely into the customizing tables.
See activation log for further information about the problems.
Error message extract from SAP system. Copyright SAP SE.
SCPR235
- &1 ended with errors ?The SAP error message SCPR235 typically indicates that a process or job has ended with errors during execution. This error can occur in various contexts, such as during the execution of a background job, a transport request, or a specific transaction. The message usually includes a reference to the specific job or process that encountered the issue.
Causes:
- Configuration Issues: Incorrect configuration settings in the system can lead to errors during job execution.
- Authorization Problems: The user executing the job may not have the necessary authorizations to perform the actions required by the job.
- Data Issues: The data being processed may contain inconsistencies or errors that prevent successful execution.
- System Resource Limitations: Insufficient system resources (like memory or disk space) can cause jobs to fail.
- Program Errors: Bugs or issues in the ABAP code or the program being executed can lead to runtime errors.
- Transport Errors: If this error occurs during a transport, it may be due to missing objects or dependencies in the transport request.
Solutions:
- Check Job Logs: Review the job logs or error logs to identify the specific error messages that occurred during execution. This can provide insight into what went wrong.
- Review Configuration: Ensure that all necessary configurations are correctly set up and that there are no missing parameters.
- Verify Authorizations: Check the user authorizations to ensure that the user has the necessary permissions to execute the job.
- Data Validation: Validate the data being processed to ensure there are no inconsistencies or errors.
- Monitor System Resources: Check system resources to ensure that there is enough memory, disk space, and other resources available for the job to execute successfully.
- Debugging: If the error is related to a specific program, consider debugging the ABAP code to identify any potential issues.
- Transport Request Review: If the error is related to a transport request, review the transport logs to identify any missing objects or dependencies.
Related Information:
If the problem persists after following these steps, it may be necessary to engage SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
SCPR234
&1 ended with warning
What causes this issue? An activation or activation simulation ended with warnings.System Response The activation was probably not successful. The c...
SCPR233
BC Sets were passed for activation more than once
What causes this issue? You passed several BC Sets for activation or activation simulation. One or more BC Sets were passed more than once.System Res...
SCPR236
&1 was canceled
What causes this issue? You performed an activation or an activation simulation. Serious problems occurred.System Response The activation was cancel...
SCPR237
Activation canceled in accordance with default settings; see long text
What causes this issue? You have made settings for an activation or an activation simulation with BC Sets, which specify that the action be cancelled...
Click on this link to search all SAP messages.