Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix SCPR229 - BC Sets cannot be activated in production systems; see the long text


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SCPR - BC Sets

  • Message number: 229

  • Message text: BC Sets cannot be activated in production systems; see the long text

  • Show details Hide details
  • What causes this issue?

    You tried to activate BC Sets in a system with at least one production
    client. This is not allowed. You can only activate Business
    Configuration Sets in systems with no production client.

    System Response

    The procedure was cancelled. No data was written into customizing
    tables.

    How to fix this error?

    Activate the BC Set in a test system.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SCPR229 - BC Sets cannot be activated in production systems; see the long text ?

    The SAP error message SCPR229 indicates that Business Configuration Sets (BC Sets) cannot be activated in production systems. This restriction is in place to ensure that changes to configuration settings are controlled and do not disrupt the stability of the production environment.

    Cause:

    The primary cause of this error is that BC Sets are intended for use in development or quality assurance systems, where changes can be tested and validated before being transported to production. Activating BC Sets directly in a production environment can lead to unintended consequences, such as configuration inconsistencies or disruptions in business processes.

    Solution:

    To resolve this error, you should follow these steps:

    1. Use Development or Quality Systems: Activate the BC Set in a development or quality assurance system first. This allows you to test the changes and ensure they work as intended.

    2. Transport Changes: Once you have successfully activated and tested the BC Set in a non-production environment, transport the changes to the production system using the standard transport management system (TMS).

    3. Manual Configuration: If you need to apply specific settings from the BC Set directly in production, you may need to manually configure those settings instead of activating the BC Set.

    4. Consult Documentation: Review the long text associated with the SCPR229 error message for any additional context or specific instructions related to your SAP version or configuration.

    5. Check Authorization: Ensure that you have the necessary authorizations to perform configuration changes in the development or quality systems.

    Related Information:

    • BC Sets: Business Configuration Sets are a way to bundle configuration settings in SAP. They are used to simplify the configuration process and ensure consistency across different systems.
    • Transport Management System (TMS): This is the tool used in SAP to manage the transport of changes between different environments (development, quality, production).
    • SAP Notes: Check for any relevant SAP Notes that may provide additional guidance or updates related to this error message.

    If you continue to experience issues or have specific requirements, consider reaching out to your SAP Basis or functional team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author