How To Fix /SCMTMS/PLN_VSR_OL461 - Cannot change assignments of document &1; load plan is finalized


/SCMTMS/PLN_VSR_OL461 - Overview

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_VSR_OL -

  • Message number: 461

  • Message text: Cannot change assignments of document &1; load plan is finalized

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMTMS/PLN_VSR_OL461 - Cannot change assignments of document &1; load plan is finalized ?
    The SAP error message /SCMTMS/PLN_VSR_OL461 indicates that you are trying to change the assignments of a document (such as a load plan) that has already been finalized in the SAP Transportation Management System (SAP TM). When a load plan is finalized, it means that the planning process is complete, and no further changes can be made to it.
    
    Cause: The primary cause of this error is that the load plan you are attempting to modify has reached a finalized state. This typically occurs when: The load plan has been confirmed and is in a status that does not allow for further modifications. The system has been configured to prevent changes to finalized documents to maintain data integrity and consistency.
    Solution: To resolve this error, you have a few options: Check Load Plan Status: Verify the status of the load plan. If it is indeed finalized, you will need to determine if it is necessary to make changes.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author