Message type: E = Error
Message class: /SCMTMS/PLN_VSR_OL -
Message number: 409
Message text: Planning not possible; resource &1 does not have capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SCMTMS/PLN_VSR_OL409
- Planning not possible; resource &1 does not have capacity ?The SAP error message /SCMTMS/PLN_VSR_OL409 Planning not possible; resource &1 does not have capacity typically occurs in the context of SAP Transportation Management (TM) when trying to plan a transportation order or shipment, and the system finds that the specified resource (like a vehicle or a carrier) does not have the required capacity to fulfill the planning request.
Cause: Insufficient Capacity: The resource (e.g., truck, container) does not have enough capacity to handle the load being planned. Resource Configuration: The resource may not be properly configured in the system, leading to incorrect capacity settings. Time Constraints: The resource may be booked or unavailable during the required planning time frame. Capacity Profiles: The capacity profiles assigned to the resource may not match the requirements of the transportation order. Resource Availability: The resource might be marked as unavailable or inactive in the system.
Solution: Check Resource Capacity: Verify the capacity of the resource in the system. Ensure that it is
Get instant SAP help. Sign up for our Free Essentials Plan.
/SCMTMS/PLN_VSR_OL408
Cannot assign schedule &1 to doc. &2; resource &3 is already assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMTMS/PLN_VSR_OL407
Cannot assign schedule &1 to doc. &2; document is already in use
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMTMS/PLN_VSR_OL410
Planning not possible; document &1 is schedule-based
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMTMS/PLN_VSR_OL411
Cannot assign schedule &1 to doc. &2; different transportation modes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.