Do you have any question about this error?
Message type: E = Error
Message class: /SCMTMS/PLN_OPT_APP -
Message number: 462
Message text: &1 of &2 package units can be planned
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SCMTMS/PLN_OPT_APP462
- &1 of &2 package units can be planned ?The SAP error message
/SCMTMS/PLN_OPT_APP462
typically indicates that there is an issue with the planning of package units in the SAP Transportation Management (TM) system. This error message suggests that a certain number of package units cannot be planned due to various reasons.Cause:
The error can be caused by several factors, including but not limited to:
- Insufficient Capacity: The transportation resources (e.g., vehicles, containers) may not have enough capacity to accommodate the specified package units.
- Planning Constraints: There may be constraints set in the planning configuration that prevent the planning of certain package units.
- Incorrect Master Data: Issues with master data, such as incorrect packaging specifications or transportation lane settings, can lead to planning failures.
- Incompatibility: The package units may not be compatible with the selected transportation mode or route.
- Configuration Issues: There may be configuration issues in the TM system that affect how package units are handled during planning.
Solution:
To resolve the error, you can take the following steps:
- Check Capacity: Verify the capacity of the transportation resources and ensure that they can accommodate the package units you are trying to plan.
- Review Planning Constraints: Look into the planning constraints set in the system and adjust them if necessary to allow for the planning of the package units.
- Validate Master Data: Ensure that all relevant master data (e.g., packaging specifications, transportation lanes) is correctly maintained and up to date.
- Examine Compatibility: Check if the package units are compatible with the selected transportation mode and route. Adjust the planning parameters if needed.
- Configuration Review: Review the configuration settings in the TM system to ensure they are set up correctly for handling package units.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or updates.
Related Information:
/SCMTMS/PLN
for planning or /SCMTMS/OPT
for optimization to analyze the planning process.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP TM for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SCMTMS/PLN_OPT_APP461
&1 package units can't be planned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMTMS/PLN_OPT_APP460
Package unit &1 can't be completely planned
What causes this issue? The optimizer can't plan package unit &V1&. This results in non-delivery costs of &V2&. This can have th...
/SCMTMS/PLN_OPT_APP464
Parts of package unit &1 not within the planning horizon
What causes this issue? The acceptable dates of package unit &V1& are outside the planning horizon.System Response The optimizer cannot plan...
/SCMTMS/PLN_OPT_APP500
FU &1 is inconsistent and is therefore fixed for this optimization run
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.