How To Fix /SCMTMS/MC_PB009 - Capacity planning already finalized for &1: Package building not possible


/SCMTMS/MC_PB009 - Overview

  • Message type: E = Error

  • Message class: /SCMTMS/MC_PB -

  • Message number: 009

  • Message text: Capacity planning already finalized for &1: Package building not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SCMTMS/MC_PB009 - Details

  • The SAP error message /SCMTMS/MC_PB009 indicates that capacity planning has already been finalized for a specific transportation package, and as a result, package building is not possible. This error typically occurs in the context of SAP Transportation Management (TM) when trying to perform actions that require modifications to a finalized planning scenario.
    
    Cause: Finalized Capacity Planning: The primary cause of this error is that the capacity planning for the transportation package has already been completed and locked. This means that no further changes can be made to the package building process. Status of the Transportation Package: The status of the transportation package may be set to a state that does not allow modifications, such as "Finalized" or "Completed." System Configuration: There may be specific configurations or settings in the SAP TM system that prevent changes to finalized packages.
    Solution: To resolve this error, you can consider the following steps: Check Package Status: Verify the status of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SCMTMS/MC_PB009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker