How To Fix /SCMTMS/GNT_PLN004 - Reassignment not possible; only reassign one activity at a time


/SCMTMS/GNT_PLN004 - Overview

  • Message type: E = Error

  • Message class: /SCMTMS/GNT_PLN -

  • Message number: 004

  • Message text: Reassignment not possible; only reassign one activity at a time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMTMS/GNT_PLN004 - Reassignment not possible; only reassign one activity at a time ?
    The SAP error message /SCMTMS/GNT_PLN004 indicates that a reassignment operation in the SAP Transportation Management (TM) system is not possible because the system only allows the reassignment of one activity at a time. This error typically occurs when a user attempts to reassign multiple activities simultaneously, which is not supported by the system.
    
    Cause: The primary cause of this error is the attempt to reassign more than one activity in a single operation. The SAP TM system is designed to handle reassignments on a one-at-a-time basis to ensure data integrity and to avoid conflicts during the reassignment process.
    Solution: To resolve this error, you should follow these steps: Reassign One Activity at a Time: Instead of selecting multiple activities for reassignment, select only one activity and perform the reassignment. This will comply with the system's requirement and should eliminate the error. Check User Documentation: Review the user documentation or help files related to the specific transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant