How To Fix /SCMTMS/FAG_MSG853 - Target share proposed by optimizer is 0; estimated spend not calculated


/SCMTMS/FAG_MSG853 - Overview

  • Message type: E = Error

  • Message class: /SCMTMS/FAG_MSG -

  • Message number: 853

  • Message text: Target share proposed by optimizer is 0; estimated spend not calculated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMTMS/FAG_MSG853 - Target share proposed by optimizer is 0; estimated spend not calculated ?
    The SAP error message /SCMTMS/FAG_MSG853 indicates that the target share proposed by the optimizer is zero, which means that the system could not calculate an estimated spend for the transportation planning process. This error typically arises in the context of SAP Transportation Management (TM) when the optimizer is unable to determine a feasible solution for the transportation planning scenario.
    Causes:
    
    
    Insufficient Data: The optimizer may not have enough data to calculate a target share. This could be due to missing or incomplete master data, such as transportation lanes, shipping points, or freight agreements.
    
    
    
    Configuration Issues: Incorrect configuration settings in the transportation management system can lead to the optimizer not being able to find a valid solution. Constraints: The constraints set in the optimization profile may be too strict, preventing the optimizer from proposing a feasible target share. Freight Agreements: If there are no valid freight agreements or if the agreements do not cover the transportation

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker