Message type: E = Error
Message class: SCMI_SEMMAP -
Message number: 015
Message text: Environment-Type &1 not assigned to any Process-ID
Environment-Type <(>&<)>1 is defined in Table SCMI_ENV_TYPE but not
assigned to any Process-ID in Table SCMI_PROC_ENV.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
SCMI_SEMMAP015
- Environment-Type &1 not assigned to any Process-ID ?The SAP error message SCMI_SEMMAP015, which states "Environment-Type &1 not assigned to any Process-ID," typically occurs in the context of SAP Supply Chain Management (SCM) or Advanced Planning and Optimization (APO) when there is a configuration issue related to the environment types and their association with process IDs.
Cause: Missing Configuration: The environment type specified in the error message is not linked to any process ID in the system. This can happen if the environment type was created but not properly assigned to a process ID. Incorrect Environment Type: The environment type being referenced may not exist or may have been deleted or renamed. Transport Issues: If the configuration was transported from another system, there may have been issues during the transport that led to missing assignments. System Upgrade or Changes: Changes in system versions or updates may have affected the existing configurations.
Solution: Check Environment Type Configuration: Go to the relevant configuration transaction (e.g., /SAPAPO/SCM_ENV or similar)
Get instant SAP help. Sign up for our Free Essentials Plan.
SCMI_SEMMAP014
Process-Id &1 Env.Value &2 not maintained in SCMI_PROC_VAL
What causes this issue? No Process-Value is defined in table SCMI_PROC_VAL for Process-ID <(>&<)>1 and Environment Value <(>&am...
SCMI_SEMMAP013
Instance creation failed for Class &1 Env.Type &2
What causes this issue? Environment Type <(>&<)>2 uses class <(>&<)>1 to determine environment-values. An error occur...
SCMI_SEMMAP016
Process-ID &1 is not assigned to any environment-type
What causes this issue? Process-ID <(>&<)>1 is defined in table SCMI_PROC_DEF but not assigned to any environment type in table SCMI_...
SCMI_SEMMAP017
Process Value is initial for Process-ID &1 Env. Value &2
What causes this issue? No process value is maintained for process-id <(>&<)>1 environment value <(>&<)>2 in table SC...
Click on this link to search all SAP messages.