How To Fix /SCMB/TMSRES_BP019 - The active capacity variant has no shift sequence assignment


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/TMSRES_BP -

  • Message number: 019

  • Message text: The active capacity variant has no shift sequence assignment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/TMSRES_BP019 - The active capacity variant has no shift sequence assignment ?

    The SAP error message /SCMB/TMSRES_BP019 indicates that the active capacity variant in the SAP Supply Chain Management (SCM) system does not have a shift sequence assignment. This error typically arises in the context of capacity planning and resource management, particularly when dealing with production planning and scheduling.

    Cause:

    1. Missing Shift Sequence Assignment: The primary cause of this error is that the active capacity variant does not have a defined shift sequence. Shift sequences are necessary for determining the availability of resources over time.
    2. Configuration Issues: There may be a configuration issue in the capacity planning settings where the shift sequences have not been properly assigned to the capacity variant.
    3. Data Inconsistencies: There could be inconsistencies or missing data in the master data related to the capacity variant or the shift sequences.

    Solution:

    To resolve this error, you can follow these steps:

    1. Check Capacity Variant Configuration:

      • Go to the transaction code SPRO to access the SAP Customizing Implementation Guide.
      • Navigate to the relevant section for capacity planning and check the configuration of the capacity variant.
      • Ensure that the active capacity variant has a shift sequence assigned.
    2. Assign Shift Sequence:

      • If the shift sequence is missing, you need to assign a shift sequence to the capacity variant.
      • This can typically be done in the capacity planning settings where you define the capacity variant and its associated shift sequences.
    3. Review Shift Sequence Settings:

      • Ensure that the shift sequences themselves are correctly defined and active. You can check this in the relevant configuration area for shift sequences.
      • Make sure that the shift sequences are valid for the time periods you are planning for.
    4. Check Master Data:

      • Verify that the master data for the resources and capacity variants is complete and accurate.
      • Ensure that all necessary data is maintained, including work centers, production resources/tools, and their respective shift sequences.
    5. Testing:

      • After making the necessary changes, test the configuration by running the relevant planning or scheduling transaction again to see if the error persists.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CR01 (Create Work Center), CR02 (Change Work Center), and CR03 (Display Work Center) for managing work centers and their associated capacities.
    • Documentation: Refer to SAP Help documentation for detailed information on capacity planning and shift sequences.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide additional guidance related to this error message.

    By following these steps, you should be able to resolve the error message /SCMB/TMSRES_BP019 and ensure that your capacity planning processes function correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author