How To Fix /SCMB/SCHED_WFUI004 - Activity type & not contained in scheduling schema &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/SCHED_WFUI -

  • Message number: 004

  • Message text: Activity type & not contained in scheduling schema &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/SCHED_WFUI004 - Activity type & not contained in scheduling schema & ?

    The SAP error message /SCMB/SCHED_WFUI004 Activity type & not contained in scheduling schema & typically occurs in the context of SAP Advanced Planning and Optimization (APO) or Supply Chain Management (SCM) when there is an issue with the scheduling schema configuration. This error indicates that the specified activity type is not defined in the scheduling schema that is being used for the planning process.

    Cause:

    1. Missing Activity Type: The activity type referenced in the error message is not included in the scheduling schema.
    2. Incorrect Configuration: The scheduling schema may not be properly configured to include all necessary activity types.
    3. Data Inconsistency: There may be inconsistencies in the master data or configuration settings that lead to this error.
    4. Transport Issues: If the configuration was recently transported from another system, it may not have been transported correctly.

    Solution:

    1. Check Scheduling Schema:

      • Go to the transaction code /SCMB/SCHED or use the relevant configuration path in SAP.
      • Verify that the scheduling schema being used includes the specified activity type.
      • If the activity type is missing, you will need to add it to the scheduling schema.
    2. Add Activity Type:

      • If you have the necessary authorizations, you can add the missing activity type to the scheduling schema.
      • Ensure that the activity type is correctly defined in the system.
    3. Review Configuration:

      • Check the configuration settings for the scheduling schema to ensure that all necessary activity types are included.
      • Make sure that the settings align with the business processes and requirements.
    4. Check Master Data:

      • Review the master data related to the activity type and ensure that it is correctly set up.
      • Look for any inconsistencies or missing entries that could lead to this error.
    5. Transport Issues:

      • If the issue arose after a transport, check the transport logs to ensure that all necessary objects were transported correctly.
      • If needed, re-transport the configuration or manually adjust the settings in the target system.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on configuring scheduling schemas and activity types.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SCMB/SCHED for scheduling schema maintenance.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the appropriate user roles and authorizations to make changes to the scheduling schema and activity types.
    • Testing: After making changes, conduct thorough testing to ensure that the error is resolved and that the scheduling process works as expected.

    If the issue persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author