How To Fix /SCMB/SCHED_LOG200 - Maximum permissible number of activity schedulings reached by &


/SCMB/SCHED_LOG200 - Overview

  • Message type: E = Error

  • Message class: /SCMB/SCHED_LOG -

  • Message number: 200

  • Message text: Maximum permissible number of activity schedulings reached by &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/SCHED_LOG200 - Maximum permissible number of activity schedulings reached by & ?
    The SAP error message /SCMB/SCHED_LOG200 Maximum permissible number of activity schedulings reached by & typically occurs in the context of SAP Supply Chain Management (SCM) when the system has reached the maximum limit of activity schedulings for a particular process or object. This can happen in various scenarios, such as during the scheduling of production orders, transportation orders, or other logistics activities.
    
    Cause: Limit Reached: The error indicates that the maximum number of activity schedulings defined in the system has been reached for a specific object or process. Configuration Settings: The limit may be set in the system configuration, which restricts the number of concurrent or queued activities that can be scheduled. System Performance: High system load or performance issues may also contribute to reaching the limit, especially if many scheduling requests are being processed simultaneously.
    Solution: Increase the Limit: If appropriate, you can increase the maximum permissible number of activity schedulings in the system configuration.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author