How To Fix /SCMB/SCHED_LOG000 - Start of complete date calculation for activity network


/SCMB/SCHED_LOG000 - Overview

  • Message type: E = Error

  • Message class: /SCMB/SCHED_LOG -

  • Message number: 000

  • Message text: Start of complete date calculation for activity network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/SCHED_LOG000 - Start of complete date calculation for activity network ?
    The SAP error message /SCMB/SCHED_LOG000 typically relates to issues in the scheduling or planning of activities within the Supply Chain Management (SCM) module. This error indicates that there is a problem with the calculation of the complete date for an activity network, which can arise from various factors.
    Causes:
    
    Missing or Incorrect Data: The activity network may have missing or incorrect data, such as start dates, end dates, or dependencies between activities.
    
    Configuration Issues: There may be configuration issues in the SCM settings that affect how dates are calculated. Resource Constraints: If resources are not available or are incorrectly allocated, it can lead to scheduling conflicts. Network Structure: The structure of the activity network may be flawed, with circular dependencies or other logical errors. System Performance: If the system is under heavy load or if there are performance issues, it may not be able to calculate dates correctly. Solutions: Check Data Integrity: Review the activity network for any

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author