How To Fix /SCMB/MC_PB_DEF151 - NLQ determination failed; none of the calculation runs was successful


/SCMB/MC_PB_DEF151 - Overview

  • Message type: E = Error

  • Message class: /SCMB/MC_PB_DEF -

  • Message number: 151

  • Message text: NLQ determination failed; none of the calculation runs was successful

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SCMB/MC_PB_DEF151 - Details

  • The SAP error message /SCMB/MC_PB_DEF151 NLQ determination failed; none of the calculation runs was successful typically occurs in the context of SAP Advanced Planning and Optimization (APO) or Supply Chain Management (SCM) when the system is unable to determine the necessary calculations for a specific planning scenario. This can happen for various reasons, including configuration issues, data inconsistencies, or problems with the planning runs.
    Causes:
    
    Data Issues: Missing or inconsistent master data (e.g., materials, locations, or resources) can lead to calculation failures.
    Configuration Problems: Incorrect settings in the planning area or planning book can prevent successful calculations.
    Execution Errors: The planning run may have encountered errors during execution, such as timeouts or resource constraints.
    Locking Issues: If another process is locking the data required for the calculation, it may lead to failures.
    Insufficient Authorizations: Lack of necessary authorizations for the user executing the planning run can also cause failures.
    
    Solutions:
    
    Check Master Data: Ensure that all relevant master

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SCMB/MC_PB_DEF151 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author