How To Fix /SCMB/MC_PB102 - No mixed layer building applied; too few incomplete layers


/SCMB/MC_PB102 - Overview

  • Message type: E = Error

  • Message class: /SCMB/MC_PB -

  • Message number: 102

  • Message text: No mixed layer building applied; too few incomplete layers

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/MC_PB102 - No mixed layer building applied; too few incomplete layers ?
    The SAP error message /SCMB/MC_PB102 No mixed layer building applied; too few incomplete layers typically occurs in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when dealing with layer building in production planning or inventory management. This error indicates that the system is unable to apply mixed layer building due to insufficient incomplete layers available for the process.
    
    Cause: Insufficient Incomplete Layers: The primary cause of this error is that there are not enough incomplete layers available in the system to perform the mixed layer building. Incomplete layers are those that have not yet been fully processed or completed.
    Configuration Issues: There may be configuration settings in the system that do not allow for mixed layer building or that limit the number of layers that can be processed. Data Issues: There could be issues with the data being processed, such as incorrect or missing information related to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker