How To Fix /SCMB/MC_PB096 - Finished mixed layer building


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/MC_PB -

  • Message number: 096

  • Message text: Finished mixed layer building

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/MC_PB096 - Finished mixed layer building ?

    The SAP error message /SCMB/MC_PB096 typically relates to issues encountered during the process of building mixed layers in the Supply Chain Management (SCM) module, particularly in the context of mixed layer building in the context of warehouse management or production planning.

    Cause:

    The error message /SCMB/MC_PB096 Finished mixed layer building usually indicates that there was an issue with the completion of a mixed layer building process. This can occur due to several reasons, including:

    1. Insufficient Stock: There may not be enough stock available to complete the mixed layer as per the defined requirements.
    2. Configuration Issues: There could be misconfigurations in the mixed layer building settings or parameters.
    3. Data Inconsistencies: Inconsistencies in master data (like material master, batch management, etc.) can lead to errors during the process.
    4. Process Interruptions: The process may have been interrupted due to system errors, user actions, or other operational issues.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Stock Availability: Ensure that there is sufficient stock available for the materials involved in the mixed layer building process.
    2. Review Configuration: Verify the configuration settings for mixed layer building in the SCM module. Ensure that all necessary parameters are correctly set.
    3. Validate Master Data: Check the master data for the materials involved. Ensure that all relevant data (like batch management, storage conditions, etc.) is correctly maintained.
    4. Analyze Logs: Look into the system logs or application logs for more detailed error messages that can provide insights into what went wrong during the process.
    5. Re-run the Process: If the issue was due to a temporary glitch, try re-running the mixed layer building process after addressing any identified issues.
    6. Consult Documentation: Refer to SAP documentation or notes related to mixed layer building for any specific guidelines or troubleshooting steps.
    7. Contact SAP Support: If the issue persists, consider reaching out to SAP support for further assistance, especially if it appears to be a bug or a more complex issue.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error message or provide patches/updates.
    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP SCM that pertain to mixed layer building and inventory management.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to diagnose and resolve the error message /SCMB/MC_PB096 effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant