How To Fix /SCMB/MC_PB090 - Mixed layer building skipped


/SCMB/MC_PB090 - Overview

  • Message type: E = Error

  • Message class: /SCMB/MC_PB -

  • Message number: 090

  • Message text: Mixed layer building skipped

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/MC_PB090 - Mixed layer building skipped ?
    The SAP error message /SCMB/MC_PB090 Mixed layer building skipped typically occurs in the context of SAP Advanced Planning and Optimization (APO) or Supply Chain Management (SCM) when the system is unable to build a mixed layer for a product in a specific location. This can happen for various reasons, and understanding the cause is essential for finding a solution.
    Causes:
    
    Insufficient Stock: There may not be enough stock of the components required to build the mixed layer.
    
    Configuration Issues: The configuration for mixed layer building may not be set up correctly in the system. Product Master Data: The product master data may be incomplete or incorrect, leading to issues in layer building. Planning Parameters: Incorrect planning parameters or settings in the APO system can prevent the mixed layer from being built. Demand and Supply Mismatch: There may be a mismatch between demand and supply, causing the system to skip the mixed layer building process. Solutions: Check Stock Levels:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker