How To Fix /SCMB/LOC_DP_ILM526 - Warning - CVP not defined on general level on ERP or SCM side


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/LOC_DP_ILM -

  • Message number: 526

  • Message text: Warning - CVP not defined on general level on ERP or SCM side

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/LOC_DP_ILM526 - Warning - CVP not defined on general level on ERP or SCM side ?

    The SAP error message /SCMB/LOC_DP_ILM526 indicates that the Collaborative Volume Planning (CVP) is not defined at the general level in either the ERP or SCM system. This warning typically arises in the context of supply chain management and planning processes, particularly when using SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP).

    Cause:

    1. Missing Configuration: The CVP settings may not be configured properly in the system. This could be due to missing entries in the configuration tables or settings that have not been maintained.
    2. Master Data Issues: The relevant master data (like location, product, or planning area) may not have been set up correctly to support CVP.
    3. Integration Issues: There may be issues with the integration between the ERP and SCM systems, leading to a lack of synchronization in the configuration settings.

    Solution:

    1. Check Configuration:

      • Navigate to the configuration settings for CVP in the SAP system.
      • Ensure that the CVP is defined at the general level in both the ERP and SCM systems. This typically involves checking the settings in the SAP APO or IBP configuration.
      • Make sure that the relevant planning areas and key figures are set up correctly.
    2. Maintain Master Data:

      • Verify that all necessary master data related to CVP is correctly maintained. This includes checking the product master, location master, and any other relevant data.
      • Ensure that the planning objects are correctly assigned to the relevant planning areas.
    3. Integration Check:

      • If you are using both ERP and SCM systems, check the integration settings to ensure that data is being transferred correctly between the two systems.
      • Look for any errors in the integration logs that might indicate issues with data synchronization.
    4. Consult Documentation:

      • Refer to the SAP documentation for CVP and the specific error message to understand any additional configuration steps that may be required.
    5. Testing:

      • After making the necessary changes, perform tests to ensure that the warning no longer appears and that CVP functions as expected.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may provide additional guidance or patches related to this error message.
    • Community Forums: Engage with SAP community forums or support channels to see if other users have encountered similar issues and how they resolved them.
    • Training and Documentation: Consider reviewing training materials or documentation related to SAP SCM and CVP to ensure a comprehensive understanding of the configuration and operational requirements.

    By following these steps, you should be able to address the warning message and ensure that CVP is properly defined in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker