How To Fix /SCMB/DM_REL015 - Release &1: For kanban release, schedule line type must be forecast type


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/DM_REL -

  • Message number: 015

  • Message text: Release &1: For kanban release, schedule line type must be forecast type

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/DM_REL015 - Release &1: For kanban release, schedule line type must be forecast type ?

    The SAP error message /SCMB/DM_REL015 indicates that there is an issue with the schedule line type when trying to release a Kanban. Specifically, the error states that for a Kanban release, the schedule line type must be of the forecast type. Here’s a breakdown of the cause, solution, and related information for this error:

    Cause:

    1. Schedule Line Type: The error occurs because the schedule line type associated with the Kanban release is not set to a forecast type. In SAP, schedule line types determine how the system processes incoming orders and deliveries. For Kanban, the system expects a specific type that aligns with forecasted demand.
    2. Configuration Issues: There may be a configuration issue in the system where the schedule line type for the Kanban process is not correctly defined or mapped to the forecast type.
    3. Master Data Issues: The material master or the Kanban configuration may not be set up correctly, leading to the wrong schedule line type being used.

    Solution:

    1. Check Schedule Line Type: Verify the schedule line type being used for the Kanban release. Ensure that it is set to a forecast type. You can do this by:

      • Navigating to the relevant transaction (e.g., MD04 or the Kanban board).
      • Checking the details of the Kanban container and its associated schedule line.
    2. Configuration Settings: If the schedule line type is incorrect, you may need to adjust the configuration:

      • Go to the configuration settings in SPRO (SAP Customizing Implementation Guide).
      • Navigate to the section for "Logistics Execution" or "Production Planning" where schedule line types are defined.
      • Ensure that the schedule line type for Kanban is correctly set to a forecast type.
    3. Material Master Data: Check the material master data for the relevant materials:

      • Ensure that the Kanban settings are correctly configured.
      • Verify that the appropriate schedule line type is assigned in the MRP views.
    4. Testing: After making the necessary changes, perform a test release of the Kanban to ensure that the error does not occur again.

    Related Information:

    • SAP Documentation: Refer to the SAP Help Portal for detailed documentation on Kanban processing and schedule line types.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • MD04 (Stock/Requirements List)
      • PKMC (Kanban Board)
      • MM02 (Change Material)
    • User Exits and BAdIs: If custom logic is involved, check for any user exits or BAdIs that might affect the schedule line determination.

    By following these steps, you should be able to resolve the error and ensure that your Kanban releases are processed correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author