How To Fix /SCMB/DM_DLV163 - Scheduling could not be determined


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/DM_DLV -

  • Message number: 163

  • Message text: Scheduling could not be determined

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/DM_DLV163 - Scheduling could not be determined ?

    The SAP error message /SCMB/DM_DLV163 Scheduling could not be determined typically occurs in the context of supply chain management, particularly when dealing with delivery scheduling in SAP Advanced Planning and Optimization (APO) or SAP S/4HANA.

    Cause:

    This error message indicates that the system was unable to determine a valid schedule for a delivery. The reasons for this could include:

    1. Missing Master Data: Essential master data such as transportation lanes, shipping points, or product availability might be missing or incorrectly configured.
    2. Incorrect Configuration: The configuration settings for the delivery scheduling might not be set up correctly, leading to scheduling failures.
    3. Capacity Issues: There may be capacity constraints in the transportation resources or production resources that prevent scheduling.
    4. Time Constraints: The requested delivery date may fall outside of the available scheduling windows or lead times.
    5. Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to scheduling issues.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Master Data:

      • Ensure that all relevant master data (e.g., transportation lanes, shipping points, and product master data) is correctly maintained and available.
      • Verify that the product is available for the requested delivery date.
    2. Review Configuration:

      • Check the configuration settings for delivery scheduling in the system. Ensure that all necessary settings are correctly defined.
      • Review the transportation management settings to ensure they align with your business processes.
    3. Analyze Capacity:

      • Check the capacity of transportation resources and production resources to ensure they can accommodate the delivery.
      • If there are capacity constraints, consider adjusting the scheduling or increasing resource availability.
    4. Adjust Time Constraints:

      • Review the requested delivery date and ensure it falls within the acceptable scheduling windows.
      • If necessary, adjust the lead times or scheduling parameters to allow for the requested delivery.
    5. Check Planning Parameters:

      • Review the planning parameters in the APO system to ensure they are set correctly for your business needs.
      • Make adjustments as necessary to align with your scheduling requirements.
    6. Consult Logs and Traces:

      • Check the application logs and traces for more detailed error messages or warnings that can provide additional context for the scheduling failure.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SCMB/DM_DLV to access delivery management functions or /SCMB/DM for detailed monitoring.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation for detailed guidance on delivery scheduling and configuration in your specific SAP environment.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant with expertise in SAP SCM/APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant