How To Fix /SCA/TLB059 - Downsizing by removing remaining quantities


/SCA/TLB059 - Overview

  • Message type: E = Error

  • Message class: /SCA/TLB -

  • Message number: 059

  • Message text: Downsizing by removing remaining quantities

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SCA/TLB059 - Details

  • The SAP error message /SCA/TLB059 Downsizing by removing remaining quantities typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with transportation or supply chain planning. This message indicates that the system is attempting to downsize a planned order or a transportation requirement by removing remaining quantities that cannot be fulfilled due to constraints or other planning parameters.
    
    Cause: Insufficient Resources: The planned order or transportation requirement may exceed the available resources (e.g., capacity of production, transportation vehicles, etc.). Planning Parameters: The settings in the planning run may not allow for the fulfillment of the entire quantity due to constraints like lead times, production rates, or transportation limits. Data Inconsistencies: There may be inconsistencies in master data, such as incorrect material availability, incorrect routing, or transportation lanes. Demand Changes: Changes in demand or sales orders that were not accounted for in the planning run can lead to discrepancies

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SCA/TLB059 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author