Do you have any question about this error?
Message type: E = Error
Message class: /SCA/TLB -
Message number: 016
Message text: Load building started for period from &1 &2 to &3 &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SCA/TLB016
- Load building started for period from &1 &2 to &3 &4 ?The SAP error message
/SCA/TLB016 Load building started for period from &1 &2 to &3 &4
typically indicates that a load building process has been initiated for a specific time period. This message is not necessarily an error but rather an informational message that indicates the system is processing data for a defined time frame.Cause:
- Load Building Process: This message is generated when the system starts the load building process for a specific period. It is part of the standard operation in SAP Supply Chain Management (SCM) or Advanced Planning and Optimization (APO) modules.
- Data Processing: The message may appear when the system is preparing to aggregate or analyze data for planning purposes, such as demand planning or supply network planning.
Solution:
- Monitor the Process: If you see this message, it is advisable to monitor the load building process to ensure it completes successfully. You can check the relevant transaction logs or monitoring tools in SAP.
- Check for Errors: If the process does not complete or if you encounter subsequent error messages, investigate those errors for further troubleshooting.
- Performance Considerations: If the load building process takes too long, consider optimizing the data volume or the performance of the system. This may involve adjusting the planning parameters or reviewing the data model.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the load building process in your version of SAP.
Related Information:
/SAPAPO/SDP94
for demand planning or /SAPAPO/MC90
for monitoring.If you are experiencing issues beyond this informational message, please provide additional context or error messages for more targeted assistance.
Get instant SAP help. Start your 7-day free trial now.
/SCA/TLB015
Transport Load Builder started for lane from &1 to &2, MTr &3, profile &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCA/TLB014
More TLB shipments (&1) than appointments (&2) on &3 at &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCA/TLB017
Upsizing rounding value wise
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCA/TLB018
Downsizing rounding value wise
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.