How To Fix /SCA/SDPR_INTERNAL096 - Promised date accuracy "inaccurate" on conf.n &1 - cancelled confirmation


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCA/SDPR_INTERNAL -

  • Message number: 096

  • Message text: Promised date accuracy "inaccurate" on conf.n &1 - cancelled confirmation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCA/SDPR_INTERNAL096 - Promised date accuracy "inaccurate" on conf.n &1 - cancelled confirmation ?

    The SAP error message /SCA/SDPR_INTERNAL096 indicates that there is an issue with the promised date accuracy for a confirmation in the system. This error typically arises in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with production planning and scheduling.

    Cause:

    The error message "Promised date accuracy 'inaccurate' on conf.n &1 - cancelled confirmation" suggests that the system has detected that the promised delivery date for a particular confirmation is not accurate. This can occur due to several reasons, including:

    1. Changes in Production Schedule: If there have been changes in the production schedule or delays in the manufacturing process, the promised date may no longer be valid.
    2. Resource Constraints: If there are resource constraints (e.g., machine breakdowns, labor shortages), the system may not be able to meet the promised date.
    3. Incorrect Configuration: There may be issues with the configuration settings in the APO system that affect how promised dates are calculated.
    4. Data Inconsistencies: Inconsistencies in master data (e.g., material master, production versions) can lead to inaccuracies in date calculations.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review the Confirmation: Check the specific confirmation referenced in the error message. Look for any discrepancies in the promised date and the actual production schedule.
    2. Check Production Orders: Verify the status of the production orders associated with the confirmation. Ensure that they are not delayed or cancelled.
    3. Update Promised Dates: If the promised date is indeed inaccurate, update it in the system to reflect the correct date based on the current production schedule.
    4. Analyze Resource Availability: Check the availability of resources (machines, labor) to ensure that they can meet the promised dates.
    5. Configuration Review: Review the configuration settings in the APO system related to date calculations and promised delivery dates. Make adjustments as necessary.
    6. Data Consistency Check: Perform a consistency check on the master data to ensure that there are no discrepancies that could affect date calculations.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as /SAPAPO/SDP94 (for viewing and managing confirmations) or /SAPAPO/SDP93 (for checking the planning board) to analyze the situation further.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message.
    • Documentation: Refer to SAP documentation for APO and production planning for more detailed information on how promised dates are calculated and managed.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author