How To Fix SAWE_TIME_PS_UI019 - In hourly planning unit, &1 days leads to overbooking for the period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SAWE_TIME_PS_UI - General Message Class Time Planning Sheet

  • Message number: 019

  • Message text: In hourly planning unit, &1 days leads to overbooking for the period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SAWE_TIME_PS_UI019 - In hourly planning unit, &1 days leads to overbooking for the period ?

    The SAP error message SAWE_TIME_PS_UI019 typically occurs in the context of project planning and scheduling, particularly when using the Project System (PS) module. This error indicates that there is an overbooking situation in the specified planning unit, which is usually measured in hours or days. The message suggests that the planned work exceeds the available capacity for the specified period.

    Cause:

    1. Overbooking: The primary cause of this error is that the total planned work (in hours or days) for a resource exceeds the available capacity for that resource during the specified time frame.
    2. Resource Allocation: There may be multiple projects or tasks assigned to the same resource, leading to a situation where the total workload surpasses what the resource can handle.
    3. Incorrect Planning Units: The planning units (e.g., days, hours) may not be aligned correctly with the resource's availability or the project's scheduling requirements.
    4. Calendar Settings: The working calendar for the resource may not be set up correctly, leading to discrepancies in available working days or hours.

    Solution:

    1. Review Resource Allocation: Check the resource assignments for the project and ensure that the workload is balanced. If a resource is overbooked, consider redistributing tasks among other available resources.
    2. Adjust Planning Units: If the planning units are not set correctly, adjust them to reflect the actual availability of the resources. Ensure that the planning units align with the project's requirements.
    3. Modify Project Schedule: If possible, adjust the project schedule to spread the workload over a longer period, thereby reducing the daily or hourly workload on the resource.
    4. Check Resource Availability: Verify the working calendar for the resource to ensure that it accurately reflects the available working days and hours. Adjust the calendar if necessary.
    5. Use Capacity Planning Tools: Utilize SAP's capacity planning tools to analyze resource utilization and identify potential overbooking issues before they occur.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CM01 (Capacity Planning) to manage project resources effectively.
    • SAP Notes: Check for any SAP Notes related to this error message for additional guidance or patches that may address specific issues.
    • Documentation: Refer to SAP documentation on Project System and resource management for best practices in planning and scheduling.

    By addressing the underlying causes of the overbooking and adjusting the project plan accordingly, you should be able to resolve the SAWE_TIME_PS_UI019 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author