Do you have any question about this error?
Message type: E = Error
Message class: SAWE_TIME_PS_GEN - General Message Class Time Planning Sheet
Message number: 002
Message text: For planning granularity &1 display time frame value &2 is invalid
For planning granularity D (daily), the display time frame upper limit
is 31.
For planning granularity W (weekly), the display time frame upper limit
is 16.
For planning granularity M (monthly), the display time frame upper limit
is 12.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Use a display time frame value that is
lower than the corresponding granularity upper limit.
Error message extract from SAP system. Copyright SAP SE.
SAWE_TIME_PS_GEN002
- For planning granularity &1 display time frame value &2 is invalid ?The SAP error message SAWE_TIME_PS_GEN002 typically indicates that there is an issue with the planning granularity and the time frame value specified in your planning scenario. This error can occur in various SAP modules, particularly in SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
Cause:
- Invalid Time Frame Value: The time frame value specified (e.g., a date or time period) does not match the expected format or is outside the valid range defined for the planning granularity.
- Mismatch in Granularity: The planning granularity set in the system does not align with the time frame value being used. For example, if the granularity is set to weeks, but a daily time frame is being referenced, this can trigger the error.
- Configuration Issues: There may be configuration issues in the planning area or the time series settings that lead to this error.
Solution:
- Check Time Frame Value: Verify that the time frame value you are using is valid and correctly formatted. Ensure that it falls within the acceptable range for the specified planning granularity.
- Review Planning Granularity: Ensure that the planning granularity is set correctly in your planning area. If you are trying to use a time frame that does not match the granularity, adjust the time frame or change the granularity settings accordingly.
- Configuration Review: Check the configuration settings in the planning area, including the time series settings, to ensure they are correctly defined. You may need to consult with your SAP Basis or configuration team to resolve any discrepancies.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the planning granularity and time frame settings relevant to your version of SAP.
Related Information:
/SAPAPO/SDP94
(for planning) or /SAPAPO/MC90
(for configuration) to access relevant planning and configuration settings.If the issue persists after following these steps, consider reaching out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
SAWE_TIME_PS_GEN001
For planning granularity &1 planning time frame value &2 is invalid
What causes this issue? For planning granularity D (daily), the planning time frame upper limit is 366. For planning granularity W ( weekly), the pla...
SAWE_PSE_SE059
Invalid input provided for the EmployeeTime node data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SAWE_TIME_PS_GEN003
For planning granularity &1 planning unit value &2 is invalid
What causes this issue? You can only use planning unit H (Hours) for planning granularity D (daily).System Response The system issues an error messa...
SAWE_TIME_PS_GEN004
Planning granularity Customizing not found for company code &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.