How To Fix SAWE_BO_SA_TIME_PS056 - For Assignment &1 &2 with &3, &4 hours forecasted in load forecast mode


SAWE_BO_SA_TIME_PS056 - Overview

  • Message type: E = Error

  • Message class: SAWE_BO_SA_TIME_PS - Message Class : Staff Assignment Time Planning Sheet

  • Message number: 056

  • Message text: For Assignment &1 &2 with &3, &4 hours forecasted in load forecast mode

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SAWE_BO_SA_TIME_PS056 - For Assignment &1 &2 with &3, &4 hours forecasted in load forecast mode ?
    The SAP error message SAWE_BO_SA_TIME_PS056 typically relates to issues in the load forecasting process within the SAP system, particularly in the context of the SAP Advanced Planning and Optimization (APO) module or similar forecasting tools. This error message indicates that there is a problem with the assignment of forecasted hours to a specific resource or activity.
    
    Cause: Data Inconsistency: The error may arise due to inconsistencies in the data being used for forecasting. This could include missing or incorrect entries in the master data or transaction data.
    Configuration Issues: There may be configuration issues in the forecasting settings or in the planning book that is being used. Resource Availability: The resource or activity being referenced may not be available or may have been incorrectly defined in the system. Time Period Issues: The time period for which the forecast is being generated may not be valid or may not align with the planning horizon.
    Solution: Check Master Data:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant