How To Fix SATC_RUN_TIME141 - DSP: Project run ended with state &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SATC_RUN_TIME - Messages of the ATC runtime layer

  • Message number: 141

  • Message text: DSP: Project run ended with state &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SATC_RUN_TIME141 - DSP: Project run ended with state &1 ?

    The SAP error message "SATC_RUN_TIME141 DSP: Project run ended with state &1" typically indicates that a project run in the SAP Test Acceleration and Optimization (TAO) tool has completed, but it has ended with a specific state that is not successful. The &1 in the message will be replaced with a specific status code that indicates the nature of the issue.

    Possible Causes:

    1. Execution Errors: The project run may have encountered errors during execution, such as missing data, incorrect configurations, or issues with the test scripts.
    2. Resource Limitations: Insufficient system resources (like memory or processing power) could lead to the project run failing.
    3. Configuration Issues: Incorrect settings in the TAO or the underlying SAP system could cause the project to end unexpectedly.
    4. Network Issues: If the project run involves remote systems, network connectivity issues could lead to failures.
    5. Script Issues: The test scripts themselves may have errors or may not be compatible with the current version of the application being tested.

    Solutions:

    1. Check Logs: Review the detailed logs generated during the project run to identify specific errors or warnings that can provide more context on why the run failed.
    2. Validate Test Scripts: Ensure that all test scripts are correctly configured and compatible with the current version of the application.
    3. Resource Monitoring: Monitor system resources during the project run to ensure that there are no bottlenecks or limitations affecting performance.
    4. Configuration Review: Double-check the configuration settings in TAO and the SAP system to ensure they are set up correctly.
    5. Retry the Run: Sometimes, simply retrying the project run can resolve transient issues.
    6. Consult Documentation: Refer to SAP documentation or support notes related to TAO for any known issues or additional troubleshooting steps.
    7. Contact SAP Support: If the issue persists and you cannot determine the cause, consider reaching out to SAP support for assistance.

    Related Information:

    • SAP TAO Documentation: Familiarize yourself with the official SAP documentation for Test Acceleration and Optimization, which may provide insights into common issues and best practices.
    • SAP Community: Engage with the SAP Community forums where other users may have encountered similar issues and can share their solutions.
    • System Updates: Ensure that your SAP system and TAO tool are up to date with the latest patches and updates, as these can resolve known bugs and improve stability.

    By following these steps, you should be able to diagnose and resolve the issue related to the error message "SATC_RUN_TIME141 DSP: Project run ended with state &1".

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant