Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 809
Message text: Missing parameter &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV809
- Missing parameter &1 ?The SAP error message
/SAPPCE/PNV809 Missing parameter &1
typically indicates that a required parameter is not being passed or is missing in the context of a specific process or function. This error is often encountered in the context of SAP's Process Integration (PI) or Process Orchestration (PO) scenarios, particularly when dealing with configuration or runtime parameters.Cause:
- Missing Configuration: The error may arise if a necessary configuration parameter has not been set in the relevant transaction or configuration settings.
- Incorrect Mapping: If you are working with mappings (e.g., in PI/PO), the error could indicate that a required field is not being mapped correctly.
- Incomplete Data: The data being processed may lack certain required fields or parameters that are expected by the system.
- Custom Development: If there are custom developments or enhancements, the error could be due to missing parameters in the custom code.
Solution:
- Check Configuration: Review the configuration settings in the relevant transaction (e.g., Integration Directory, IDoc settings, etc.) to ensure that all required parameters are set correctly.
- Review Mapping: If applicable, check the mapping configuration to ensure that all necessary fields are being mapped correctly and that there are no missing parameters.
- Validate Input Data: Ensure that the data being processed contains all required fields. You may need to validate the source data to ensure completeness.
- Debugging: If the error persists, consider debugging the process to identify where the missing parameter is expected. This may involve looking at logs or using transaction codes like SLG1 (Application Log) to gather more information.
- Consult Documentation: Refer to SAP documentation or notes related to the specific process or function you are working with to identify any known issues or additional configuration steps that may be required.
Related Information:
If you continue to experience issues, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific environment and configuration.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV808
Entry missing for the corresponding checkbox structure &1
What causes this issue? You are trying to change data. The change-relevant fields must be identified by selecting the relevant fields in an additiona...
/SAPPCE/PNV807
Data does not correspond to the data from construction progress report &1
What causes this issue? For the construction progress report to be changed &v1&, the WBS element or fiscal year or period cannot be changed. ...
/SAPPCE/PNV810
More than 999 items have been transferred
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/PNV811
No operated share determined for WBS-E1 &1;Operated share in venture is 0
What causes this issue? Joint venture data such as <LS>Joint Venture</> and <LS>Equity Type</> is available for the WBS eleme...
Click on this link to search all SAP messages.