Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 211
Message text: Contract values and planned revenues/costs do not have same CO version
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV211
- Contract values and planned revenues/costs do not have same CO version ?The SAP error message /SAPPCE/PNV211 Contract values and planned revenues/costs do not have same CO version typically occurs in the context of Project System (PS) or Controlling (CO) modules when there is a mismatch between the controlling versions used for contract values and the planned revenues or costs associated with a project or contract.
Cause: Different CO Versions: The error indicates that the contract values are recorded in one CO version, while the planned revenues or costs are recorded in another. This can happen if the system is configured to use different versions for different purposes (e.g., actual vs. planned). Data Entry Errors: Manual data entry errors can lead to inconsistencies in the CO versions assigned to different elements of the contract.
Configuration Issues: The configuration of the controlling area or project settings may not align, leading to discrepancies in the CO versions being used.
Solution: Check CO Versions: Review the CO versions assigned to the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPPCE/PNV210
Consolidation account not assigned for cost element &1
What causes this issue? The consolidation account specifies the cost element under which the system should create the consolidation posting. For cost...
/SAPPCE/PNV209
Cost element &1 not permitted for &2
What causes this issue? Cost element &v1& is not allowed for &v2&.System Response The data is not created or changed.How to fix this...
/SAPPCE/PNV212
Enter a valid planning type; & is not allowed
What causes this issue? The planning type <(>&<)>v1& you have used is not allowed here. Allowed values are: O - Contract (order) ...
/SAPPCE/PNV300
********** Messages 300 - 350 reserved for valuation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.