Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 211
Message text: Contract values and planned revenues/costs do not have same CO version
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV211
- Contract values and planned revenues/costs do not have same CO version ?The SAP error message
/SAPPCE/PNV211 Contract values and planned revenues/costs do not have same CO version
typically occurs in the context of Project System (PS) or Controlling (CO) modules when there is a mismatch between the controlling versions used for contract values and the planned revenues or costs associated with a project or contract.Cause:
- Different CO Versions: The error indicates that the contract values are recorded in one CO version, while the planned revenues or costs are recorded in another. This can happen if the system is configured to use different versions for different purposes (e.g., actual vs. planned).
- Data Entry Errors: Manual data entry errors can lead to inconsistencies in the CO versions assigned to different elements of the contract.
- Configuration Issues: The configuration of the controlling area or project settings may not align, leading to discrepancies in the CO versions being used.
Solution:
Check CO Versions: Review the CO versions assigned to the contract values and the planned revenues/costs. Ensure that they are using the same version.
- You can do this by navigating to the relevant transaction codes (e.g., CJ20N for project management) and checking the details of the contract and associated planned costs/revenues.
Adjust CO Version: If you find that the CO versions are different, you may need to adjust the settings to ensure consistency. This could involve:
- Changing the CO version for either the contract values or the planned revenues/costs to match.
- If necessary, consult with your SAP configuration team to ensure that the correct CO version is being used for all relevant entries.
Data Consistency Check: Run consistency checks in the system to identify any other discrepancies that may exist. This can help in identifying if there are other related issues that need to be addressed.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing CO versions and resolving related errors.
User Training: Ensure that users involved in data entry and project management are trained on the importance of maintaining consistency in CO versions to prevent similar issues in the future.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your contract values and planned revenues/costs are aligned correctly within the same CO version.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV210
Consolidation account not assigned for cost element &1
What causes this issue? The consolidation account specifies the cost element under which the system should create the consolidation posting. For cost...
/SAPPCE/PNV209
Cost element &1 not permitted for &2
What causes this issue? Cost element &v1& is not allowed for &v2&.System Response The data is not created or changed.How to fix this...
/SAPPCE/PNV212
Enter a valid planning type; & is not allowed
What causes this issue? The planning type <(>&<)>v1& you have used is not allowed here. Allowed values are: O - Contract (order) ...
/SAPPCE/PNV300
********** Messages 300 - 350 reserved for valuation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.