How To Fix /SAPPCE/PNV206 - Indicator 'Integrated Planning' not active for WBS element &1


/SAPPCE/PNV206 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 206

  • Message text: Indicator 'Integrated Planning' not active for WBS element &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPPCE/PNV206 - Details

  • The SAP error message /SAPPCE/PNV206 Indicator 'Integrated Planning' not active for WBS element &1 typically occurs when you are trying to perform integrated planning activities on a Work Breakdown Structure (WBS) element that has not been configured to allow integrated planning.
    
    Cause: The error indicates that the WBS element you are trying to use for planning does not have the "Integrated Planning" indicator activated. This can happen for several reasons: The WBS element was created without the integrated planning feature enabled. The project or WBS element settings have not been properly configured to allow integrated planning. The project type associated with the WBS element may not support integrated planning.
    Solution: To resolve this error, you can follow these steps: Check WBS Element Settings: Go to the WBS element in question using transaction code CJ20N (Project Builder) or CJ02 (Change WBS Element). Check the properties of the WBS element to see if the "Integrated Planning" indicator is set. If it is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPPCE/PNV206 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author