Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 036
Message text: Selection not possible; Selected row is not a WBS element
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV036
- Selection not possible; Selected row is not a WBS element ?The SAP error message
/SAPPCE/PNV036 Selection not possible; Selected row is not a WBS element
typically occurs in the context of project management, particularly when working with Project System (PS) modules. This error indicates that the system is expecting a Work Breakdown Structure (WBS) element, but the selected row does not correspond to a valid WBS element.Causes:
- Incorrect Selection: The user may have selected a row that is not a WBS element, such as a network activity, cost element, or another type of project component.
- Data Integrity Issues: There may be issues with the data in the project structure, such as missing or incorrectly defined WBS elements.
- Authorization Issues: The user may not have the necessary authorizations to view or select WBS elements.
- Configuration Issues: The system configuration may not be set up correctly to recognize certain elements as WBS elements.
Solutions:
- Verify Selection: Ensure that the row you are trying to select is indeed a WBS element. You can do this by checking the project structure in the Project Builder (transaction code
CJ20N
) or the WBS element overview.- Check Data Integrity: Review the project structure for any inconsistencies or missing WBS elements. You can use transaction codes like
CJ03
(Display WBS) to check the details of the WBS elements.- Review Authorizations: Ensure that you have the necessary authorizations to access and select WBS elements. You may need to contact your SAP security team to verify your roles and permissions.
- Consult Configuration: If you suspect a configuration issue, consult with your SAP Basis or configuration team to ensure that the system is set up correctly to recognize WBS elements.
- Use Alternative Transactions: If the error persists, try using different transactions or reports that may provide a clearer view of the project structure and WBS elements.
Related Information:
CJ20N
(Project Builder), CJ03
(Display WBS), and CJ01
(Create WBS).If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV035
WBS element permitted for performance notification &1 cannot be statistic
What causes this issue? For WBS element &V1& the indicator is set to <LS>Statistical</>. A performance notification-relevant WBS ...
/SAPPCE/PNV034
Error during conversion; Check BAdI implementation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/PNV037
Total service value is negative
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/PNV038
First enter an end date in the project definition
What causes this issue? If you create or change a construction progress report, the posting date of the construction progress report document must li...
Click on this link to search all SAP messages.